Portfolio
Selected
Work
A curated selection of projects that represent our approach: rigorous engineering, measurable outcomes, and systems that perform under pressure.
5 Case Studies
[01]All Projects
7D
UPTIME
0.00%
LATENCY
0ms
REQUESTS
0.0M
ERRORS
0.00%
Fintech202314 months
Matching engine rebuilt to handle €2.2M in daily derivatives volume
Cutting order execution latency from 15ms to under 400µs to win back institutional market makers.
Performance OptimizationPlatform Engineering
Volt Exchange
380µs
P99 Matching Latency
€2.3B
Daily Notional Volume
342%
Volume Growth
SERVICE MESH
7/16 online
click to toggle nodes
Media & Entertainment20235 months
Scaling a content platform to 480K monthly visitors without a rewrite
The team was convinced they needed a new architecture. The data said otherwise.
System ArchitecturePerformance Optimization
Orbital Media
48M
Monthly Visitors
1.4s
P75 Mobile Load Time
−21%
Infrastructure Cost
EDGE TOPOLOGY
9/9 online
9 online
All 9 nodes connected
Manufacturing202210 months
IoT telemetry platform for 12,800 industrial robots across 94 facilities
Building an edge data pipeline that stays consistent even when factory network links go dark for hours.
Platform EngineeringSystem Architecture
NexGen Robotics
12,847
Robots Connected
4.1 TB
Daily Telemetry
−63%
Unplanned Downtime
Have a Similar
Challenge?
Every project in this portfolio started with a conversation.Let's discuss your challenge and explore whether we're the right fit.
Start a Conversation